Gravel Calculator
Use the Gravel Calculator to estimate material volume, approximate US tons and cost for a rectangular gravel layer. Length, width and depth determine geometric volume, waste is added, and the density you enter converts the adjusted volume into weight. Density is deliberately editable because different aggregates, moisture conditions and gradations can produce different weights for the same volume.
Enter non-negative measurements. Zero coverage, yield or package size cannot produce a purchase estimate; a zero quantity in that case does not mean no material is needed. Changing units reinterprets the entered numbers; re-enter all dimensions and product coverage in the selected units. Material quantities are planning estimates. Confirm actual package coverage, density, dimensions and installation requirements before purchasing.
Gravel estimate formula
- Cubic yards = area (sq ft) × depth (in) ÷ 12 ÷ 27.
- 1 cubic yard covers about 162 sq ft at 2 in, 108 sq ft at 3 in or 81 sq ft at 4 in.
- Tons depend on the stone's density; use your supplier's figure to convert.
- Add extra for compaction and uneven ground.
How to use the Gravel Calculator
- In imperial mode, depth in inches is divided by 12 before multiplying length × width × depth.
- In metric mode, depth in centimetres is divided by 100 before the volume calculation.
- The raw volume is normalized to cubic metres.
- The entered waste allowance is then added.
- Adjusted volume is displayed in cubic metres and cubic yards.
- Adjusted cubic metres are converted to cubic feet for the weight calculation.
- Approximate weight in pounds equals cubic feet multiplied by the entered density in lb/ft³.
- Approximate US tons equal pounds divided by 2,000.
- Estimated cost equals approximate US tons multiplied by price per ton.
- The density field controls the volume-to-weight conversion and should reflect the aggregate being purchased where possible.
- There is no separate compaction model.
Measure and enter the project
Measure each layer’s area and intended depth; inches and centimetres must be converted before multiplying by length and width. Separate layers with different depths. Ask the supplier whether their quoted volume describes loose delivered material or compacted material.
Before ordering or starting work
Density is always lb/ft³ and price is per US short ton, including in metric dimension mode. A US ton is 2,000 lb, not a metric tonne. Waste is not a compaction ratio. Check moisture, grading and supplier conversion before ordering; delivery and compaction work are excluded.
Examples
20 ft × 10 ft area at 3 inches deep
A 20 ft × 10 ft layer at 3 inches deep contains 50 ft³ before waste.
Add 10% waste
A 10% allowance increases 50 ft³ to 55 ft³, or about 2.04 cubic yards.
Use 100 lb/ft³ density
At an entered density of 100 lb/ft³, 55 ft³ weighs approximately 5,500 lb.
Convert pounds to US tons
5,500 lb divided by 2,000 equals approximately 2.75 US tons.
Estimate material cost
At $50 per ton, 2.75 modeled tons produces an estimated material cost of $137.50.
Why supplier density matters
If the actual material density is higher or lower than the value entered, the tonnage and cost estimate will change even when project volume stays the same.
Independently checked planning example
20 × 10 × 3/12 × 1.10 = 55 ft³; × 100 lb/ft³ / 2000 = 2.75 US tons; hypothetical $50/ton = $137.50. These inputs and prices are hypothetical, not product specifications or local quotes.
Cubic yards of gravel
| Area | 2 in deep | 3 in | 4 in | 6 in |
|---|---|---|---|---|
| 50 sq ft | 0.31 | 0.46 | 0.62 | 0.93 |
| 100 sq ft | 0.62 | 0.93 | 1.23 | 1.85 |
| 200 sq ft | 1.23 | 1.85 | 2.47 | 3.70 |
| 400 sq ft | 2.47 | 3.70 | 4.94 | 7.41 |
| 800 sq ft | 4.94 | 7.41 | 9.88 | 14.81 |
Frequently asked questions
How is gravel volume calculated?
The calculator multiplies project length, width and depth after converting depth to consistent units.
Why does the calculator ask for density?
Volume alone does not determine weight. Density converts the calculated volume into approximate pounds and US tons.
Are the displayed tons metric tonnes?
No. They are US tons of 2,000 lb. One US ton is about 0.907 metric tonnes, so 3 US tons is about 2.72 tonnes.
Does it include waste?
Yes. The entered percentage is added to calculated volume before weight is determined.
Does the calculator model compaction?
No. There is no separate compaction factor.
Should I use my supplier's density?
Yes when available. The specific material's supplier conversion or density is generally preferable to a generic assumption.
How is gravel cost estimated?
Approximate US tons are multiplied by the entered price per ton.
Can I use a price quoted per cubic yard?
Not directly in the price-per-ton field. Use the displayed cubic yards with the supplier’s yard rate separately, or obtain a consistent tonnage quote and density.
More home & diy tools
Concrete Calculator
Estimate concrete volume for slabs, walls, footings and round columns.
Open tool →Asphalt Calculator
Estimate asphalt volume, approximate weight and material cost.
Open tool →Paver Calculator
Estimate patio or walkway paver quantity, packs, joints, waste and cost.
Open tool →Mulch Calculator
Estimate mulch volume, bags, cubic yards and material cost.
Open tool →Topsoil Calculator
Estimate topsoil volume, bags and bulk quantity.
Open tool →Roofing Calculator
Estimate simple gable roof area, squares, bundles and waste.
Open tool →